Installing the pipelineInstalling the pipeline

The pipeline was installed between December 2007 and January 2008. It is 2.25km long, stainless steel and 50mm in diameter.

Installing the pipelineInstalling the pipeline

Pipeline trenching and testing.



Installing the pipelineInstalling the pipeline

Horizontal directional drilling.

Drilling CRC-1Drilling CRC-1

Drilling of the CRC-1 well to inject CO2 into a depleted gas field in the the Waarre C Formation, began on 15 February, 2007, and was completed within budget on 15 March, 2007.



Drilling CRC-1Drilling CRC-1

Drilling the CRC-1 injection well. It is a vertical monobore well and was drilled to a depth of 2249m into the Eumeralla Formation.

Core samplesCore samples

Five core samples were acquired during the drilling, totalling 42.9 m in length. Other samples collected include fluid, mud gas and cuttings. These samples enabled researchers to confirm that their data and modelling was correct.



Core samplesCore samples

Geological core samples from the Otway Project CRC-1 well.

Core samplesCore samples

Geological core samples from the Otway Project CRC-1 well.