Images & Videos


Otway Project images

Stage 2 drilling - Otway ProjectStage 2 drilling - Otway Project

Over 176 metres of core was obtained during drilling.

Stage 2 drilling - Otway ProjectStage 2 drilling - Otway Project

Tess Dance from CSIRO examines a core sample.



Stage 2 drilling - Otway ProjectStage 2 drilling - Otway Project

Core samples can tell geologists a great deal about the makeup of a reservoir.

Stage 2 drilling - Otway ProjectStage 2 drilling - Otway Project

The drilling rig at the Otway Project site.



Stratigraphic columnStratigraphic column

Stratigraphic diagrams show the rock layers

CO2 source: Buttress-1CO2 source: Buttress-1

The Buttress production wellhead is connected to the Buttress-1 surface plant which comprises three different units: the process skid; a compressor and an after cooler.



CO2 Source: Buttress-1CO2 Source: Buttress-1

The process skid at the Buttress-1 (production) site includes a suction scrubber to remove free liquids, filters to remove solids and a water bath heater to prevent hydrate formation.

CO2 source: Buttress-1CO2 source: Buttress-1

The compressor overcomes pipeline pressure losses and provides additional pressure.




PREV 1 2 3 4 5 6 7 NEXT
LATEST NEWS

Follow us on twitter

WHAT'S NEW
CO2CRC NEWS

CO2CRC NEWS is a regular newsletter which brings you updates on the latest news and events from CO2CRC.

Latest issue >>